46 sewer segments
San Antonio Water System
The Central Sewershed project rehabilitated multiple sanitary sewer segments by either CIPP, open-cut or pipe-burst methods.
The 30 percent design phase analyzed the conditions of 46 sewer segments by reviewing CCTV, reviewing manhole conditions while performing survey and assessing pavement conditions and project locations to determine the construction method for rehabilitation.
Halff recommended bidding 24 segments as a CIPP bid package, maximizing the construction efficiency of the contractor’s expertise. The project required minimal point repairs, pavement repair coordination, utility coordination and preparation of construction plans to include sewer bypass plans and traffic control plans.
The final submittal included a construction schedule to determine the project’s construction duration and OPCC. The team coordinated with COSA to secure floodplain and tree permits.
Halff Services
Involved
- Local Infrastructure
- SUE/Utility Coordination
- Transportation
- Water Conveyance & Pumps
- Water/Wastewater Treatment
Let’s Connect
Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.